Case Study / 03

Scaling-up operations

0→1 Design Team Lead'21-'22
Role
Design Team Lead (0→1)
Team
Grew 0 → 5 designers
Duration
2021 – 2022
Outcome
Operations platform shipped
Context

Placeholder — what state the operations tooling was in when I joined, and why it needed a design function.

Approach

Placeholder — how I hired and structured the team, and the rhythm we set up with product and engineering.

Outcome

Placeholder — what shipped, and what the team looked like when I handed it over.

Placeholder figure — replace with a screen or artifact.
Placeholder figure — replace with a screen or artifact.